И додека ние си спиеме, комшиите работат многу засилено! Еве дел од градбата на ТЕЦ Марица Изток 4. Тоа е 4та ТЕЦ во најголемиот Балкански енергетски комплекс, кои се наоѓа во област Стара Загора. Самиот комплекс се состои од досегашните Марица Изток 1 - 500 MW, Марица Изток 2 - 1,470 MW и Марица Изток 3 - 900 MW.
The Bulgarian power regulator is expected to open a competitive procedure for the construction of a new 700 MW plant in the Maritsa Iztok basin. In addition to Enel's new power station project, the construction of new power station is proposed by the German utility RWE. RWE and the Martisa Iztok mining complex have signed an agreement on setting up a joint company that will apply for construction of the power station. RWE expects the investment to be €900 million to €1 billion, and the power station to be ready by 2013. Градбата на разладната кула, висока 137 м: |
|||||||||||
pbanks
Admin Group Joined: 01-Sep-2007 Location: Skopje Online Status: Offline Posts: 9141 |
Quote Reply #2 Posted: 27-Jan-2009 at 02:10 | ||||||||||
Баш вчера глеав за ова. Алал да им е а ние само да продолжиме да одмараме |
|||||||||||
Vladimir P
Senior Member Joined: 06-Apr-2008 Location: Скопје Online Status: Offline Posts: 3304 |
Quote Reply #3 Posted: 20-Mar-2009 at 18:18 | ||||||||||
Гасоводен проект Набуко, приоритет на ЕУ, уште еден прескок на Mакедонија
http://www.nabucco-pipeline.com/ |
|||||||||||
Клуб на љубители на железниците во Македонија, Macedonian Railways Fan Club
https://www.facebook.com/767277056651521/ |
|||||||||||
lslcrew
Senior Member Joined: 14-Jan-2008 Location: Skopje Online Status: Offline Posts: 10988 |
Quote Reply #4 Posted: 20-Mar-2009 at 18:30 | ||||||||||
Набуко прекд некој ден беше симнат од листа на приоритети. Е сега незнам како другачије би стигнал долнокавказкиот гас со средна европа освен набуко. Не гледам јас никаква коснпиративност у тоа што Македонија не е дел од трасата, впрочем и не треба да биде ако порационално се подразмисли, кој е ќарот.
|
|||||||||||
Vladimir P
Senior Member Joined: 06-Apr-2008 Location: Скопје Online Status: Offline Posts: 3304 |
Quote Reply #5 Posted: 20-Mar-2009 at 18:44 | ||||||||||
|
|||||||||||
Клуб на љубители на железниците во Македонија, Macedonian Railways Fan Club
https://www.facebook.com/767277056651521/ |
|||||||||||
lslcrew
Senior Member Joined: 14-Jan-2008 Location: Skopje Online Status: Offline Posts: 10988 |
Quote Reply #6 Posted: 20-Mar-2009 at 18:49 | ||||||||||
|
|||||||||||
Vladimir P
Senior Member Joined: 06-Apr-2008 Location: Скопје Online Status: Offline Posts: 3304 |
Quote Reply #7 Posted: 20-Mar-2009 at 19:29 | ||||||||||
Клуб на љубители на железниците во Македонија, Macedonian Railways Fan Club
https://www.facebook.com/767277056651521/ |
|||||||||||
Forensic
Newbiе Joined: 13-Jun-2008 Online Status: Offline Posts: 0 |
Quote Reply #8 Posted: 26-Apr-2009 at 14:34 | ||||||||||
Dragan
Senior Member Joined: 19-Feb-2009 Location: Tetovo Online Status: Offline Posts: 1172 |
Quote Reply #9 Posted: 23-May-2009 at 16:12 | ||||||||||
Словенија се вклучува во „Јужен тек“
Словенија се согласи да потпише договор со Русија за изградба на гасоводот „Јужен тек“ преку нејзина територија, пренесува Макфакс. „Ние ќе потпишеме. Словенија реши дека сака да учествува во проектот“, изјави словенечкиот министер за економија Матеј Лаховник, за време на заедничката прес конференција со рускиот министер за комуникации Игор Шчеголев. Според словенечкиот министер, финалниот договор ќе биде потпишан во јуни, откако ќе се реши прашањето околу транзитните такси. Copyright
2009 makfax. Сите права се задржани. Текстов не смее да се печати или
емитува, во целина или во делови, без договор со makfax. |
|||||||||||
Cloverstack
Admin Group Joined: 01-Sep-2007 Location: Скопје Online Status: Offline Posts: 12453 |
Quote Reply #10 Posted: 09-Jun-2009 at 20:05 | ||||||||||
http://dnevnik.com.mk/?ItemID=13CAAD42B858FA43A1ACC9D1F57E54C4 |
|||||||||||
La Linea
Senior Member Joined: 07-Nov-2007 Location: Skopje Online Status: Offline Posts: 2067 |
Quote Reply #11 Posted: 09-Jun-2009 at 21:55 | ||||||||||
Еве ја истата вест од А1 ама малце поопширно
Me интересира колкави се изгледите овој план на Албанија да се оствари? Ќе треба повеќе од овие 3 хидроцентрали за да го заслужо епитетот „супер-сила“, но не сум доволно упатен да зборам. Само знам дека ако некој има потенцијал да стане енергетска супер сила, тоа е Бугарија која само од нуклеарните извори на енергија располага со две НЕЦ, а остануваат и хидроценталите, термоцентралите(особено ТЕ Марица) и еолските централи(кои се малку но ги има). Да не го заборавиме и гасоводот Набуко кој ќе помнува од тука. Албанија е сепак години оддалечена од изградбата на овие 3 хидроцентрали, а нејзиниот енергетски сектор не е единстветниот кој бара сериозни инвестиции.
http://www.a1.com.mk/vesti/default.aspx?VestID=109771 Edited by La Linea - 09-Jun-2009 at 21:58 |
|||||||||||
Помогнете во Македонската Википедија - Слободна енциклопедија!
|
|||||||||||
Vladimir P
Senior Member Joined: 06-Apr-2008 Location: Скопје Online Status: Offline Posts: 3304 |
Quote Reply #12 Posted: 09-Jun-2009 at 22:15 | ||||||||||
Човекот мислел во регионот но на Албанија, рачунајќи до сега и од сега |
|||||||||||
Клуб на љубители на железниците во Македонија, Macedonian Railways Fan Club
https://www.facebook.com/767277056651521/ |
|||||||||||
lslcrew
Senior Member Joined: 14-Jan-2008 Location: Skopje Online Status: Offline Posts: 10988 |
Quote Reply #13 Posted: 06-Jul-2009 at 03:20 | ||||||||||
Непосредно после граничен премин Дојран...
|
|||||||||||
Cloverstack
Admin Group Joined: 01-Sep-2007 Location: Скопје Online Status: Offline Posts: 12453 |
Quote Reply #14 Posted: 12-Jul-2009 at 03:00 | ||||||||||
http://dnevnik.com.mk/?ItemID=7079BA4FB73B764F8B1C51B9DA234B89 |
|||||||||||
Vladimir P
Senior Member Joined: 06-Apr-2008 Location: Скопје Online Status: Offline Posts: 3304 |
Quote Reply #15 Posted: 13-Jul-2009 at 10:40 | ||||||||||
|
|||||||||||
Клуб на љубители на железниците во Македонија, Macedonian Railways Fan Club
https://www.facebook.com/767277056651521/ |
|||||||||||
vardar
Senior Member Joined: 03-Mar-2008 Online Status: Offline Posts: 1106 |
Quote Reply #16 Posted: 16-Jul-2009 at 23:31 | ||||||||||
|
|||||||||||
pavche
Senior Member Joined: 17-Jun-2009 Online Status: Offline Posts: 431 |
Quote Reply #17 Posted: 29-Jul-2009 at 18:38 | ||||||||||
Hydro-power project "Tsankov kamak" in Bulgaria is near completion. Some details about it:
Double curvature arch concrete dam wall
Volume: 111 000 000 m³
Maximum dam height: 130 m
Dam crest elevation: 688 m
Dam length along the crest: 468 m
Dam chord: 345 m
Volume of concrete: 465 000 m³ It is part of the Dospat - Vacha cascade Schematic layout Tsankov Kamak project
The cost of the project is 220 mil EUR. Works started in 2004 and the official opening will be in early 2010. It is financed by export and commercial credits without sovereign guarantee. ~ half of the sum (100 million Euro) is covered by an export credit, guaranteed by the Austrian bank Oesterreichische Kontrolbank Aktiengellschaft (OeKB). Due to the realization of the hydro power project Tsankov Kamak, the emisions
of harmful gases, sulphur oxides, nitrogen oxides, dust and СО2, that are released
in the production of electricity by thermoelectrical power plants, will be reduced.
According to the Kyoto Protocol in the period of 2008 to 2012, Austria and Bulgaria
are charged to lower the emissions of harmful gases. The project allows the saved
emissions of СО2 to be granted to Austria in order to complete her obligations
according to the Kyoto Protocol. The reduced emissions are paid to Bulgaria by
Austria with a price of 10 USD per ton of reduced emissions.
The forecasted reduced emissions from the thermoelectric power plants, by using
the Dospat-Vacha cascade and the construction of hydroelectric power plant Tsankov
Kamak as well as the rehabilitation of the rest four hydroelectric power plants
is 228 000 tons of СО2 annually. Some pics of the Dam construction : |
|||||||||||
Cloverstack
Admin Group Joined: 01-Sep-2007 Location: Скопје Online Status: Offline Posts: 12453 |
Quote Reply #18 Posted: 31-Jul-2009 at 21:51 | ||||||||||
http://a1.com.mk/vesti/default.aspx?VestID=112123 |
|||||||||||
pavche
Senior Member Joined: 17-Jun-2009 Online Status: Offline Posts: 431 |
Quote Reply #19 Posted: 31-Jul-2009 at 23:54 | ||||||||||
It's Simeon Djankov(not Gankov), ex- chief economist of the World Bank and the new financial minister of Bulgara, and Yes! We're probably finally through with this nonsense
The price 4 bil. EUR was quoted at least 3 years ago, last calculations were for between 7 and 9 bil. This whole project was just a big failure from the very start - the price wasn't fixed, there was no real competition on the tender(it was decided from the very start that the technology will be Russian(not 3rd but old 2nd generation reactors) and no other than russian competitors were allowed to perticipate on it. So things are actually comming to their normal end - The new government simply freezes the project for now(unless a private investor shows up), refuses to plead for a multibillion debt from Russia(as the intention of the previous one was), refuses to give any more state garantees for its financing and most important of all - starts investigations how the whole project was managed by the previous government and what mistakes/crimes they might have commited with it. Bulgaria is the country with the worst energy efficiency ratio in the whole EU - Simeon Djankov said that if they manage to improve the energy efficiency with ~15 or 20% there will be more energy saved than the output of Belene if completed will be. Besides there are many other energy projects near completion in Bulgaria in the comming years so that before 2015 the country will produce about twice the energy it comsumes, without Belene, so the latter has no economical logic. |
|||||||||||
Cloverstack
Admin Group Joined: 01-Sep-2007 Location: Скопје Online Status: Offline Posts: 12453 |
Quote Reply #20 Posted: 01-Aug-2009 at 14:43 | ||||||||||
Way too late for Bulgaria to be pulling out. The plant is under construction and the Bulgarian government is not the only investor for god's sake. All the arguments you give, even if 100% true, can't fix the situation. To me it looks like a populist maneuvering of the new government, which will probably replace the corrupt dealings of the previous government with corrupt dealings on its own. But even if the new government is totally honest about this thing, this is still a catastrophy. This kind of pull out is not something a serious state does. Edited by Cloverstack - 01-Aug-2009 at 14:44 |
|||||||||||