build.mk Homepage
Forum Home Forum Home > Главни теми > Проекти
  Active Topics Active Topics RSS Feed: Diamond of Skopje  (Limak)
  FAQ FAQ  Forum Search   Register Register  Login Login

Diamond of Skopje (Limak)

Bookmark and Share
 Post Reply Post Reply Page  <1 161718
Author
Message
  Topic Search Topic Search  Topic Options Topic Options
stef4o View Drop Down
Senior Member
Senior Member


Joined: 20-Oct-2015
Location: Skopje
Online Status: Offline
Posts: 2466
  Quote stef4o Quote  Post ReplyReply #341 Posted: 23-Jul-2019 at 12:28
Од фб

Back to Top
Џоле View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 23-Apr-2013
Location: Скопје
Online Status: Offline
Posts: 12203
  Quote Џоле Quote  Post ReplyReply #342 Posted: 25-Jul-2019 at 09:22
Старата железничка станица остана како споменик на катастрофата. Фирмата „Лимак“, која гради огромен комплекс зад неа и треба да пробие подземен булевар, е обврзана да го среди и овој објект. Што значи тоа?

Проектот на „Лимак“ е проект што го наследивме и е врзан со договор што Градот и Општина Центар го имаат со инвеститорот. За мене беше императив во фазата на отпочнување на градежните работи да се обезбеди од евентуално оштетување остатокот од Старата железничка станица, уште повеќе што таму се наоѓа Музејот на Град Скопје. Она што барав од инвеститорот е да се извршат најпрво заштитни работи околу објектот, за да не дојде до негово понатамошно оштетување, и тој ќе биде и ќе остане доволно видлив и доволно впечатлив да продолжи да биде симбол на градот од една страна и потсетник на трагедијата од друга страна.

Објектите што сега се прават во комплексот „Лимак“ не се во делот на подземниот булевар. Таму се гради хотел, кој никогаш не бил дел од проектот на „Лимак“.

Земјените работи за пробивање на подземна сообраќајница се во тек, затоа што самата сообраќајница е основа на проектот. Она што го гледаме во моментот, што се одвива како градежна работа, не е воопшто дел од тој комплекс и не е воопшто објект што се наоѓа над подземната сообраќајница.

целото интервју со Шилегов тука https://nezavisen.mk/shilegov-za-nezavisen-skopje-kje-se-shiri-na-sever/
За сè има вторпат
Back to Top
Enzo View Drop Down
Groupie
Groupie


Joined: 25-Jun-2019
Online Status: Offline
Posts: 48
  Quote Enzo Quote  Post ReplyReply #343 Posted: 25-Jul-2019 at 10:46
Кој хотел се гради таму што не е дел од проектот на Лимак ?
Back to Top
Џоле View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 23-Apr-2013
Location: Скопје
Online Status: Offline
Posts: 12203
  Quote Џоле Quote  Post ReplyReply #344 Posted: 25-Jul-2019 at 16:49
Originally posted by Enzo

Кој хотел се гради таму што не е дел од проектот на Лимак ?


...

Originally posted by Џоле

Хотелот и деловна зграда истовремено



За сè има вторпат
Back to Top
carver91 View Drop Down
Groupie
Groupie


Joined: 09-Mar-2015
Online Status: Offline
Posts: 53
  Quote carver91 Quote  Post ReplyReply #345 Posted: 25-Jul-2019 at 20:45
The construction of the hotel is going well.
We are closing in the construction on the top level-exterior and structural works.
The hotel is planned to be operational by Jan-Feb of 2020.
It will be a 4 or 5 star hotel operated by a well known hotel brand,shortly to be decided.

It consists of 3 dedicated parking levels, 142 rooms in total, 2000 square meters of banquet area, 1500 square meters for Casino,
fitness area, Turkish bath, 6000 square meters for a business center.
Back to Top
Obedineta Makedonija View Drop Down
Senior Member
Senior Member
Avatar

Joined: 23-Aug-2011
Location: Macedonia
Online Status: Offline
Posts: 1605
  Quote Obedineta Makedonija Quote  Post ReplyReply #346 Posted: 25-Jul-2019 at 21:34
Originally posted by carver91

The construction of the hotel is going well.
We are closing in the construction on the top level-exterior and structural works.
The hotel is planned to be operational by Jan-Feb of 2020.
It will be a 4 or 5 star hotel operated by a well known hotel brand,shortly to be decided.

It consists of 3 dedicated parking levels, 142 rooms in total, 2000 square meters of banquet area, 1500 square meters for Casino,
fitness area, Turkish bath, 6000 square meters for a business center.


Тоа со казиното ми вели дека можен бренд би бил - Рамада(Принцез)
Создаваме за да имаме, а и тоа што го имаме треба да го чуваме такво какво што е !!!!
Back to Top
stef4o View Drop Down
Senior Member
Senior Member


Joined: 20-Oct-2015
Location: Skopje
Online Status: Offline
Posts: 2466
  Quote stef4o Quote  Post ReplyReply #347 Posted: 28-Jul-2019 at 09:49
Од фб







Back to Top
Џоле View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 23-Apr-2013
Location: Скопје
Online Status: Offline
Posts: 12203
  Quote Џоле Quote  Post ReplyReply #348 Posted: 02-Aug-2019 at 22:08
Полека хотелот ги добива контурите од рендерот...

За сè има вторпат
Back to Top
Portal View Drop Down
Senior Member
Senior Member
Avatar

Joined: 13-Nov-2010
Online Status: Offline
Posts: 404
  Quote Portal Quote  Post ReplyReply #349 Posted: 30-Aug-2019 at 17:48
slusam stopirana stopirana bila izgradbata na ostanatite delovi...!?

Edited by Portal - 30-Aug-2019 at 18:18
Back to Top
Enzo View Drop Down
Groupie
Groupie


Joined: 25-Jun-2019
Online Status: Offline
Posts: 48
  Quote Enzo Quote  Post ReplyReply #350 Posted: 30-Aug-2019 at 18:06
Originally posted by Portal

slusam stopirana stopirana bila izgradbata...!?

Кај си слушнал такво нешто,денес со бус поминвав покрај ова и на секој дел од теренот имаше работници што работеа.
Back to Top
alexsend View Drop Down
Senior Member
Senior Member
Avatar

Joined: 11-May-2011
Location: Скопје, Центар
Online Status: Offline
Posts: 1784
  Quote alexsend Quote  Post ReplyReply #351 Posted: 30-Aug-2019 at 21:33
Секој ден се работи, секој.
Јас Скопје никогаш не сум го замислувал вака.
Back to Top
Џоле View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 23-Apr-2013
Location: Скопје
Online Status: Offline
Posts: 12203
  Quote Џоле Quote  Post ReplyReply #352 Posted: 04-Sep-2019 at 19:05
За сè има вторпат
Back to Top
stef4o View Drop Down
Senior Member
Senior Member


Joined: 20-Oct-2015
Location: Skopje
Online Status: Offline
Posts: 2466
  Quote stef4o Quote  Post ReplyReply #353 Posted: 10-Sep-2019 at 12:20
Денешни





Back to Top
 Post Reply Post Reply Page  <1 161718

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.156 seconds.

Copyright ©2007 - 2019  build.mk

Коментарите на форумот претставуваат лично мислење на нивните автори и не претставуваат официјален став на build.mk.