Од регионот и од светот |
Post Reply | Page <1 2122232425 26> |
Author | |
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #441 Posted: 15-Jul-2021 at 16:58 |
Synergy Tower-Sofia(fb)
|
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #442 Posted: 22-Jul-2021 at 17:30 |
Sofia Expo Tower
|
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #443 Posted: 12-Aug-2021 at 22:52 |
Sofia
|
|
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #444 Posted: 13-Aug-2021 at 16:51 |
Street view of the recently completed Kazakhstan Business Center in Astana (Nūr-Sūltan)
https://www.facebook.com/besian.mehmeti.arch |
|
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #445 Posted: 15-Aug-2021 at 08:13 |
Sky Fort Sofia
https://www.facebook.com/SkyscraperCityBulgaria |
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #446 Posted: 22-Aug-2021 at 18:46 |
Sofia
Park Lane Office Center Balkan Business Center |
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #447 Posted: 25-Aug-2021 at 13:28 |
NV Tower
|
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #448 Posted: 29-Aug-2021 at 16:41 |
Sky Waves - U/C
|
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #449 Posted: 08-Sep-2021 at 18:41 |
Целостна реконструкция на Energoproekt Tower.
Сградата сменя и предназначението си - от административно-деловна става целостно на Office center. Преди Сега |
|
zabegan
Senior Member Joined: 01-Jul-2008 Location: Skopje Online Status: Offline Posts: 7859 |
Quote Reply #450 Posted: 08-Sep-2021 at 19:46 |
можеби е ствар на вкус, ама повеќе ми се допаѓа претходната фасада, можеле евентуално да ги сменат стаклата
|
|
Architects create dreams...politicians create nightmares
|
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #451 Posted: 08-Sep-2021 at 22:56 |
Копирали са Park Avenue |
|
Green Bay
Newbie Joined: 27-Nov-2014 Online Status: Offline Posts: 30 |
Quote Reply #452 Posted: 14-Sep-2021 at 20:19 |
|
|
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #453 Posted: 07-Oct-2021 at 10:47 |
Synergy Tower, Sofia Tech Park
|
|
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #454 Posted: 14-Oct-2021 at 17:08 |
Center for New Technologies and Entrepreneurship 'The Triangle' by Arhitektonski biro Prostor #Šibenik #Croatia
The Center for New Technologies and Entrepreneurship 'The Triangle' provides a modern, sociable working environment for start-ups, freelancers and digital nomads, as well as educational opportunities for different age groups. The EU funded project was commissioned by the City of Šibenik with a goal to promote this city on the Adriatic coast as an appealing destination for living and working. The south-sloping plot between two streets is located on the city's periphery in post-military industrial zone, with limited views of the sea and the city. These location conditions imposed a concept of a building that is introverted but not hermetically sealed. The building is made of three basic formal elements: an extended stairway in the middle, a sunken concrete base, and a cantilevered floating volume with concrete construction that is visually lightened with airy facade made of white perforated steel sheet panels. In the middle of the building, extended stairways connect the north and south entrance. The lower exterior stairway is an extension of south entrance square, while interior stairway with seating is a place for informal work, interaction and events. Various types of workspaces surround the central glazed atrium: flexible workspace by the café, fab lab workspace and classroom on the ground floor, open-plan workspace and closed offices on the first floor. Conditions for quality work are met by adding soundproof phone booths, closed offices and meeting rooms. Aside from workspaces, the building is equipped with additional amenities, areas for relaxation and a 'fabrication laboratory', a workshop with different kinds of tools. https://www.facebook.com/EUMiesAward/ |
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #455 Posted: 14-Oct-2021 at 20:29 |
Sofia Green Tower - 215m/55f
Три години след обявяването на проекта и получаване на проектантска виза , най-после имаме визуализация и рендери на един от най-оспорваните и дискутирани обекти в София. |
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #456 Posted: 19-Oct-2021 at 14:32 |
Sofia- new projects in build
Rojen Office Center Das Center Expo Forest Office Building 1 |
|
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #457 Posted: 21-Oct-2021 at 13:22 |
Matrix Office Park – првиот LEED Platinum сертифициран бизнис центар во Хрватска
Новиот бизнис центар во Загреб е изграден следејќи ги растечките потреби од канцелариски простор. Идејата да се создаде во градот единствен и пријатен работен простор за околу 1400 вработени од различни компании е стара околу 20 години. Конечно пред 3 години Загреб тргна во реализација на она што денес претставува модерен деловен комплекс со околу 21.000 метри квадратни расположива површина сместена во две згради – Matrix A и Matrix B. Matrix Office Park е единствениот LEED Platinum сертифициран бизнис центар во Хрватска и само втор објект генерално кој има ваков сертификат во земјата. LEED Platinum сертификацијата, доделена од страна на American Green Building Council (USGBC), потврдува дека зградите се развиени на најодржливиот можен начин, земајќи ја во предвид потрошувачката на вода, енергетската ефикасност, изборот на безбедни и природни материјали, квалитетот на воздух, природното осветлување и сл. За време на изградбата на Matrix Office Park, посветено е особено внимание на заштита на животната средина, следејќи ги најдобрите практики во однос на одржливоста и енергетската ефикасност. Притоа, користени се 21% рециклирани материјали, 84% регионални материјали, додека над 89% од отпадот кој се создал на градилиштето бил рециклиран. Matrix Office Park користи геотермална енергија за греење, дождовница за наводнување на зелените површини (парцијален зелен покрив) и има значително пониска вкупна емисија нa CO2 од конвенционалните објекти. https://www.porta3.mk/matrix-office-park-prviot-leed-platinum-sertificiran-biznis-centar-vo-hrvatska/ |
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #458 Posted: 31-Oct-2021 at 14:50 |
Bucharest
Equilibrium Office Green Court One Controgeni Park |
|
Galileo
Senior Member Joined: 25-May-2010 Location: Wien Online Status: Offline Posts: 1436 |
Quote Reply #459 Posted: 02-Nov-2021 at 17:42 |
Sofia
Energy Tower FPI Bussines Center Varna Platinum Tower |
|
stef4o
Moderator Group Joined: 20-Oct-2015 Location: Skopje Online Status: Offline Posts: 20536 |
Quote Reply #460 Posted: 29-Nov-2021 at 14:23 |
Sofia
https://www.facebook.com/SkyscraperCityBulgaria |
|
Post Reply | Page <1 2122232425 26> |
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |